Schedule: Setting a Pump to Stop Prior to the Schedule Completing

Observant Support

Created: ; updated: .

In some cases it's desirable to stop a pump prior to the schedule ending. This might be necessary in a pressurised system to ensure the system isn't under pressure when the last valve or riser closes.

To schedule the pump to turn off some time before the end of the schedule, click on the pump in the schedule editor to bring up the settings window: 

Screen_Shot_2020-08-06_at_5.36.08_pm.png

Click on 'Stop at end of schedule' to bring up the end different options and select 'Stop earlier':

Screen_Shot_2020-08-06_at_5.37.48_pm.png

That will ensure the pump is scheduled to stop before the last valve or riser is closed.

 

Have more questions? Submit a request
Powered by Zendesk