Schedule: Setting a Pump to Stop Prior to the Schedule Completing

Observant Support

Created: ; updated: .

In some cases it's desirable to stop a pump prior to the schedule ending. This might be necessary in a pressurised system to ensure the system isn;t under pressure when the last valve or riser closes.

To schedule the pump to turn off some time before the end of the schedule, click on the "with delay" option for the pump item in the schedule as seen here:

That will ensure the pump is scheduled to stop before the last valve or riser is closed.

 

Have more questions? Submit a request
Powered by Zendesk